100% Original Factory Tilt Indicator Labels - Plasma – Jianzhong
Short Description:
Product Introduction: This indicator strip is placed inside the package or container to monitor some or all of the parameters of hydrogen peroxide low temperature plasma sterilization process. Classes 4 of chemical indicator in accordance with ISO 11140-1 The color turns from red to yellow, and the process is obvious. Instant, accurate and convenient. Specifications: Code Description Size Unit/Box Plasma Indicator 20mm x 100mm 200PCS
Product Detail
Product Tags
Related Video
Feedback (2)
100% Original Factory Tilt Indicator Labels - Plasma – Jianzhong Detail:
Product Introduction:
This indicator strip is placed inside the package or container to monitor some or all of the parameters of hydrogen peroxide low temperature plasma sterilization process.
Classes 4 of chemical indicator in accordance with ISO 11140-1
The color turns from red to yellow, and the process is obvious.
Instant, accurate and convenient.
Specifications:
Code | Description | Size | Unit/Box |
Plasma Indicator | 20mm x 100mm | 200PCS |
Product detail pictures:

Related Product Guide:
Cooperation
We always believe that one's character decides products' quality, the details decides products' high-quality ,together with the REALISTIC,EFFICIENT AND INNOVATIVE crew spirit for 100% Original Factory Tilt Indicator Labels - Plasma – Jianzhong, The product will supply to all over the world, such as: Chile, Peru, Montreal, The company attaches great importance to product quality and service quality, based on the business philosophy "good with people, genuine to whole world, your satisfaction is our pursuit". we design products, According to customer's sample and requirements, to meet the needs of the market and offer different customers with personalized service. Our company warmly welcomes friends at home and abroad to visit, to discuss cooperation and seek common development!

This manufacturers not only respected our choice and requirements, but also gave us a lot of good suggestions, ultimately, we successfully completed the procurement tasks.
